Browse all the latest information on PBA. Items range from
articles on industry trends to our latest awards.
Peter Basso Associates is pleased to announce the following:
Conrad, Peck and Seidl Pass Professional Engineer Exam
Peter Basso Associates Hires Mechanical Engineer Joanna Chudzinski
Peter Basso Associates Hires Lighting Designer Tracey Guzman
Peter Basso Associates to Commission Nine Additional Meijer Stores
Mike Romano earns PE
High Density Cooling for Data Centers ...
"Developments in IT equipment have allowed for large numbers of servers and equipment to be installed in smaller spaces. This creates intense areas of heat, which traditional underfloor air distribution systems may not be able to accomodate. To reduce the risk of equipment damage from overheating, a high density cooling system can be added, which may be a more practical solution than trying to create or accommodate an extremely deep plenum for the underfloor air system," says Dennis P. Sczomak, PE, LEED AP.
Despite Benefits For Renovation Projects, Use of Rehabilitation Code is Limited ... Rehabilitation Code
Building Owners Reduce Risk of Fines and Enhance Worker Safety by Enforcing Arc Flash Standards
As seen in Facility Management Journal July/Aug 2005... Arc Flash
Hewlett-Packard Customer Success Story
Peter Basso Associates is known for producing innovative mechanical and electrical engineering designs ... HP Case Study
Lighting Standards Generate Energy Cost Savings up to 40%
According to Michigan-based full-service engineering firm Peter Basso Associates, creating compliant lighting systems is saving building owners significant ...Lighting Controls
|
5145 Livernois
Suite 100
Troy, MI 48098
T: 248-879-5666
F: 248-879-0007
416 Longshore Drive
Ann Arbor, MI 48105
T: 734-913-4749
F: 734-913-4957
3960 Howard Hughes Pkwy
Suite 500
Las Vegas, NV 89169
T: 702-990-3879
F: 866-613-3461
2340 W. Mission Lane
Suite 8
Phoenix, AZ 85021
T: 480-458-7799
F: 866-61303461 |